Q. Our basement is unfinished, and we plan to put in walls and a finished ceiling. We know we need an escape window, but what are your suggestions on other things, like the kind of ceiling? I’m thinking about just sheetrock, but what kind of access do you recommend for the pipes and wires I’ll need to get to?
A. There are many items to include in your thought process for finishing your basement. Mistakes are made, first, by ever assuming that the people doing the work know the laws.
The biggest problem I see is that the ceiling is just a little too low, that someone dropped the entire ceiling level just because of one pipe. The minimum ceiling height in the current code is 6 feet 8 inches clearance, with 6 feet 4 inches under the center beams, air ducts or soffits anywhere in the basement. Always leave access for shutoff valves, wiring connections, cleanouts and other controls.
If you need to move pipes that were installed without any care for your future use of the basement, move them. Piping should go around the perimeter of the basement, no matter what excuse you hear. Because of poor planning and even worse execution, pipes are the No. 1 problem, because someone thoughtlessly put them in a place that was good for them and not for you.
The ceiling finish can be sheetrock in the larger areas with perimeter “hung” track ceilings outfitted with removable ceiling tiles. Again, even those lowered perimeter and under-beam soffits need to be no less than 6 feet 4 inches above the floor. Tall firefighters need to avoid hitting their heads when they’re running though your smoke-filled basement to rescue you or your loved ones.
© 2025 Monte Leeper. Readers are encouraged to send questions to yourhousedr@aol.com, with “Herald question” in the subject line, or to Herald Homes, 2 Endo Blvd., Garden City, NY 11530, Attn: Monte Leeper, architect.